EPC
Six stages, one contract, and we are responsible for all of it. Land is secured before engineering begins. Transmission develops alongside the plant, not after it. The team that commissions the asset maintains it.
We are responsible for quality, schedule and safety. From feasibility and detailed engineering through procurement, construction and commissioning — design in-house, procurement from qualified vendor lists, execution supervised by our own engineers.
MODEL
- Turnkey EPCC
SEGMENTS
- Utility
- C&I
- Captive
ENGINEERING
- In-house design cell
HERITAGE
- Construction discipline since 1994